| slo | eng | de | hr
|
LIP BLED d.o.o.
Rečiška 61 a,
4260 Bled, Slovenija
t.: +386 4 579 50 00
f.: +386 4 579 51 21
e: lipbl@lip-bled.si
     

The process of installation of interior doors

[ 29. 09.2008 ]
We are offering you practical advice on installation of interior doors.
  • Door shall be installed in dry rooms with relative humidity between 40 and 65%. This is of particular importance in new buildings – new buildings need to be well dried and then regularly ventilated.
  • Before installation it is necessary to check the door for potential faults of delivered elements.
  • Door shall be installed in accordance with instructions, enclosed to the frame.
  • Install the frame and fortify it vertically into the wall opening with the help of spacers and wedges, hang the door leaf on hinges and check its functionality. Apply proper amount of polyurethane foam over gaps between the frame and the wall hole.
  • Clean after you finish the installation.
  • Any claim with regard to deformed leaf will be considered after one-month use during summertime or after two weeks use after the beginning of heating season.
Professional advice
Why some doors tend to crook?
Due to climate impacts some materials change their dimensions.
Action
Newsletter
Would you like to receive our newest information on our products and our offer?